Construction & renovation of Fatima block second stories
Priority No 1:
Construction & renovation of Fatima block 2 stories with Ramp, Elevator, Labor Room, O.T Nursery & Equipment’s at top floor of Gynae block. Estimated Cost. Rs. 40,000,000/- (40 Million)
Future Plans
Construction & renovation of main Operation Theatre
Priority No 2:
Construction & renovation of main Operation Theatre for General Surgery, Orthopedic Surgery, ENT Surgery Urology Surgery etc. on Emergency block as per plans with equipment’s. Estimated Cost. Rs. 20,000,000/-
(20 Million)
Future Plans
Carpeting of main road from main road to Gynae block
Priority No 3:
Carpeting of main road from main road to Gynae block
Estimated Cost. Rs. 10,000,000/-
(10 Million)
Future Plans
Construction of Nurses hostel at 4th floor of Qazi block
Priority No 4:
Construction of Nurses hostel at 4th floor of Qazi block with elevator for 24/7 availability. Estimated Cost. Rs. 15,000,000/- (15 Million)
Future Plans
Constructions of hospital stores
Priority No 5:
Constructions of hospital stores adjacent to the proposed dialysis hall on School block. Estimated Cost. Rs. 5,000,000/-
( 5 Million)
Future Plans
Class room chairs with audio visual aids
Priority No 6:
Class room chairs with audio visual aids for Mansoorah institute of paramedics sciences Lahore. Estimated Cost. Rs. 10,000,000/- (10 Million)